Civic Issues
Topics getting the most attention in Conway public meetings, ranked by how frequently they are discussed.
17 issues with high priority
Budget Debate
Administrator Emrick previewed next year's budget direction: after years of big new projects, the city wants to polish existing infrastructure and amenities instead of adding more. Council also asked for budget ideas earlier and floated a budget retreat.
Police Pursuit Safety Following Recent Fatality
Council Member Butler asked the city to keep talking with Horry County about high-speed police chases after another young man died on Sunday morning — at least the second recent such death.
Downtown Tourism and Visitor Growth
Tourism-tax money — $149,302 — goes to the Chamber, Downtown Alive, Theatre of the Republic, and the Farmers Market to fund events that draw visitors.
ADA Accessibility and Pedestrian Safety
A resident flagged a food truck parked in the only van-accessible spot behind the town green, city vehicles occupying accessible spaces, and new sidewalks without required ADA tactile pads. He wants it fixed before the December crowds arrive and wants event street closures to come before Council.
New State Law Allowing Street-Legal UTVs
Starting November 18, side-by-sides can be tagged and driven on roads, and police leaders say enforcement will be extremely difficult — age limits, helmet rules, and a 10-mile radius are nearly impossible to verify on the street.
Wetlands and stormwater protection at Mill Pond
Residents asked the city to lock in enhanced stormwater standards, a hydrological review by Horry County, a ban on a gas station in the wetland corner, and a Crabtree Canal access easement for the county before second reading.
Commercial Strip Center Parking and Driveway Standards
The city is tightening rules for commercial parking and driveway entrances to prevent traffic jams at busy strip malls and fast-food spots.
Janette Street and US 701 South Intersection Safety Upgrade
Council voted down spending $350,000 in city funds for decorative mast arm traffic signals at a dangerous intersection, sticking with standard cable signals provided by SCDOT.
Highway 378 Major Residential and Park Development
A large 120-acre property on Highway 378 is officially joining Conway, bringing new homes, a 21-acre public park, and walking trails.
Kingston Bay Subdivision Drainage and Construction Issues
The city is undertaking a massive, grant-funded stormwater improvement project from Pine Street to Kingston Lake to upgrade aging pipes and prevent flooding. Residents should expect temporary road closures and detours across several neighborhoods through the spring.
Right-of-Way Remediation and Developer Accountability
A resident criticized poor right-of-way restoration following utility work on Country Club Drive, prompting council discussions on developer accountability and impact fees.
Buccaneers Cove Annexations and Planned Development
The council denied two annexation requests on Patterson Drive and Emory Street because the connecting roads were unimproved and did not meet city standards. Officials want to ensure proper infrastructure before bringing new properties into city limits.
Comprehensive Plan Transportation Element Update
The city is hiring an outside consulting firm, Kimley-Horn, to evaluate transportation needs and create prioritized recommendations as part of the Comprehensive Plan update. This study aims to address increasing traffic pressures from rapid local growth.
Trail and Ferry Project
Conway is moving forward with a $2.48 million project to build the new Kingston Boardwalk Trail and Ferry. This initiative will bring fresh outdoor recreation spots and better connections right to town.
Sycamore Street Townhome Rezoning Denial
Residents and council rejected a proposal to bring townhomes into a neighborhood of single-family homes on Sycamore Street, preserving the area's existing residential character.
Willard Road – Alford Road Water Main Loop Project
The city is investing in a major water infrastructure upgrade, using in-house staff to build a 6,000-foot water line loop to improve fire protection and system reliability.
Open Space Fee-in-Lieu Calculation Revisions
The city is changing how developers pay fees when they don't provide open space in new subdivisions, replacing complex appraisals with flat rates of $12 per square foot for active space and $8 for passive space.