Horry County · week of October 24, 2026

Planning Commission recommends approval of Rezone 14.67 acres to RE-4 on Old Sanders Drive/Robert Edge Parkway (Canca Land)

Summarized from the official meeting transcript — every claim links to the moment it was said. How we make this

What changed in Horry County

Development activity

  • Kenneth Winburg rezone and subdivision

    PD Road South, Galivants Ferry

    7.36 acres originally sought as AG-2, amended on the spot to MSF-20 so the 84-year-old owner can carve out and sell a homesite.

    approved · pending → approved

    Track this project →
  • DRGR (Canal Land) rezone, Old Sanders Drive

    Old Sanders Drive and Robert Edge Parkway, Little River

    Rezone 14.67 acres from CFA to RE-4 near the North Myrtle Beach line; approved with sensitivity to the adjacent historic cemetery.

    approved · pending → approved

    Track this project →
  • Diamond Shores Trade Shop Rezoning

    Hwy 90, Conway

    65.36 acres rezoned to PDD for 29 homes, 30 townhomes, nine cottages, and low-intensity commercial, with design standards, tree protections, and donated Highway 90 right-of-way.

    approved · still approved

    Track this project →
  • Collins Track PDD

    Middle Ridge Avenue, Myrtle Beach

    472.8 acres rezoned to PDD for 394 houses, 392 apartments, and 33 acres of commercial, with five acres donated for public benefit and a 10-foot walking trail.

    approved · still approved

    Track this project →
  • Simpson Creek Drive accessory dwelling rezone

    Simpson Creek Drive, Loris

    .9 acres from MSF-40 to MSF-14.5 for a detached accessory dwelling unit; the future land use amendment and rezone both failed.

    denied · still denied

    Track this project →
  • West Highway 9 Business lot reconfiguration

    West Highway 9 Business, Loris

    .89 acres to MSF-20 so a fire-destroyed home can be rebuilt on a combined lot; denied because required variances aren't yet secured.

    denied · still denied

    Track this project →
  • Bridgewater PDD amendment (Wawa gas station and car wash)

    Water Grande Boulevard and Highway 9, Little River

    3.14-acre PDD amendment to allow gas pumps and a car wash — a Wawa, billed as the first in South Carolina — at the Bridgewater community entrance; approved.

    approved · still approved

    Track this project →
  • West Homewood Road manufactured home park

    West Homewood Road, Conway

    46.51 acres to MHP for 60 manufactured homes; denied because of surrounding industrial zoning.

    denied · still denied

    Track this project →
  • Waterside Drive outdoor storage rezone

    270 Waterside Drive / Highway 643, Myrtle Beach

    5.28 acres from MHP to RE-4/MSF-14.5 to legalize outdoor storage; denied after neighbors called it a slippery slope next to their residential street.

    denied · still denied

    Track this project →
  • New Home Circle three-lot subdivision

    New Home Circle, Conway

    2.25 acres from LFA to SF-20 to create three lots; denied over flooding and stormwater concerns, with the applicant saying he'll build two homes instead.

    denied · still denied

    Track this project →
  • 472.8-acre CFA to PDD rezone with development agreement

    394 single-family homes and 392 multifamily units on 472.8 acres, with county land dedication, per-unit fees and a trail.

    Discussed — no decision yet

    Track this project →
  • Grand Strand Water and Sewer Authority pump station, Lake Ridge PUD

    Section 5.40 review for a pump station and reservoir facility with maintenance and equipment components.

    approved · still approved

    Track this project →
  • Cardona ADU rezone, Simpson Creek

    Simpson Creek, Loris

    Rezone MSF 40 to MSF 14.5 to convert an existing permitted structure into a family accessory dwelling unit.

    Discussed — no decision yet

    Track this project →
  • Diamond Shores rezone, Highway 90

    Highway 90

    Previously deferred 65.36-acre PDD with homes, cottages, townhomes and commercial; design standards now written into the ordinance.

    Discussed — no decision yet

    Track this project →
  • Santa's Realty LLC rezone

    Waterside Road and Highway 643, Myrtle Beach

    5.28 acres from MHP to residential and RE 4 outdoor storage for a landscape business.

    Discussed — no decision yet

    Track this project →
  • Darifa Lewis manufactured home park

    West Homeward Road, Conway

    60 manufactured homes on 46.51 acres; prior deferral over West Homewood Road encroachment and easement.

    Discussed — no decision yet

    Track this project →
  • Inman three-lot subdivision rezone

    4479 Highway 19, Conway

    2.25 acres from LFA to SF 20 for a three-lot subdivision; stormwater ditch setback still being worked out.

    Discussed — no decision yet

    Track this project →
  • Hampton Inn & Suites vested rights extension

    Queensway Boulevard

    One-year vesting extension for the multi-level hotel expansion, now through January 1, 2028.

    approved · still approved

    Track this project →
  • Waterbridge PDD amendment — convenience store, gas pumps and car wash

    Highway 9, Little River

    Amendment to the Waterbridge PDD to add a gas station and car wash use on 3.14 acres; MOU fee applies.

    Discussed — no decision yet

    Track this project →
  • Myrtle Grove Plantation Phase 4 vested rights extension

    First of five one-year vesting extensions for the 71-lot subdivision, new expiration December 16, 2027.

    approved · still approved

    Track this project →
  • Battle Shore rezone for Ronda Sol Williams

    0.89 acres from FA to MSF 20 to reconfigure the lot and let a fire-destroyed home be rebuilt.

    Discussed — no decision yet

    Track this project →

Also discussed

  • Highway 90 Mixed-Use Development and Conservation

    Residents told commissioners about roughly 3,400 homes already approved on Highway 90, dangerous left turns out of their neighborhoods, and whether roads can handle more growth before the Diamond Shores rezoning was approved.

    What it means: No dollar figure given; the developer will donate right-of-way and build turn lanes if the project develops before the state widens Highway 90.

    Raised 2 times this week

    Follow this issue →
  • Manufactured home park on West Homewood Road

    A 60-home manufactured home park is proposed in Conway; the earlier deferral centered on a road encroachment and easement along West Homewood Road.

    What it means: Adds affordable manufactured housing options in Conway.

    Follow this issue →
  • Fire survivors seeking to rebuild via lot reconfiguration

    A family whose house burned down discovered it sat on the property line, blocking rebuild permits; the rezoning lets them reconfigure the oddly shaped lot and build their home again.

    What it means: The displaced family gets to rebuild their home.

    Follow this issue →
  • 472-acre planned development with county dedication

    A developer wants to rezone 472.8 acres to PDD for nearly 800 homes, offering the county five acres, per-unit fees ($5,800 per home/unit, $6.03 per commercial square foot) and a trail. Density is unusually low for the size, and the deal terms matter for county services and future growth.

    What it means: The developer would pay the county $5,800 per home or apartment plus a commercial fee, and hand over five acres and a trail.

    Follow this issue →
  • Code Compliance and Unpermitted Commercial Operations

    Residents of a small, decades-old neighborhood off Highway 644/501 fear rezoning 5.28 acres for outdoor storage opens the door to 50-plus commercial uses next to their dead-end residential street.

    What it means: The property owner seeking to legalize existing unpermitted outdoor storage.

    Follow this issue →
  • Wetland Buffers and Tree Preservation Ordinance

    Multiple speakers cited the county's reported 37% loss of tree canopy since 2001 and nearly 20% loss of forested wetlands, warning that stormwater has fewer places to go as development continues.

    What it means: Developments that incorporate buffers and retention ponds gain flood resilience.

    Follow this issue →
  • Highway 9/17 intersection traffic safety and the Bridgewater Wawa

    Residents say the short stretch where Highway 17 merges into Highway 9 near Water Grande Boulevard is a crash-prone 'crisscross nightmare,' and they fear adding a gas station and car wash at the Bridgewater entrance will make it worse. One speaker cited 116 collisions there in 2024.

    What it means: The PDD's MOU requires a $1,000 fee per $100,000 of commercial construction cost, but no direct county cost was cited.

    Follow this issue →
  • Manufactured home park siting near industrial zones

    A 60-home manufactured home park proposal failed because the surrounding area is industrial — raising questions about where affordable manufactured housing can go in the county.

    What it means: Would-be residents of affordable manufactured housing, though the project was denied.

    Follow this issue →
  • Rural density precedent on New Home Circle

    Neighbors worry that allowing three houses on 2.25 acres in a rural area sets a precedent for more rezonings — and raises drainage questions near wetlands.

    What it means: The landowner, who said he would instead build the two homes currently allowed.

    Follow this issue →

Published by South Carolina Record. 2 meetings covered.