Civic Issues
Topics getting the most attention in North Myrtle Beach public meetings, ranked by how frequently they are discussed.
44 issues in development
Commercial development along the Highway 17 corridor
Two applications touch Highway 17 South: a change of use at 3910 Highway 17 South and revised plans for the Drift development. Both signal continued commercial activity along the corridor.
Private Property Mural Grant Program
The commission planned to hear a report on the mural grant program so it could start publicizing it to property owners. This program supports art on private buildings around the city.
Large-lot Farmhouse Circle subdivision
A preliminary plat would carve a private road through seven existing parcels on nearly 240 acres off Atlantic Breeze Drive, creating ten parcels total.
Grande Dunes North Phase 4 — 111 new homes
Final plats for two more phases of Grande Dunes North would lock in 111 townhouse lots and 12 residential lots, moving the development forward.
Large home reviews on South Ocean Boulevard
Two neighboring six-bedroom beach houses are proposed on South Ocean Boulevard. Both must prove their stormwater stays on-site, meet flood-freeboard rules, and add a sidewalk along Ocean Boulevard.
43-unit car-enthusiast garage development on Water Tower Road
The Parkway Group PDD is being amended to allow 43 storage garages plus a clubhouse, car shows, social events, and food trucks. No staff objections were raised at this technical review stage.
Our Lady Star of the Sea parsonage expansion
The Catholic church wants to add about 772 square feet to its parsonage, bringing it to six sleeping areas. That triggers extra impact fees, stormwater storage rules, and requirements to record an off-site parking agreement.
Little River Neck Road annexation
A landowner wants to split property on Little River Neck Road into lots, likely three, with a new cul-de-sac. The city flagged sewer extensions, fire access, and 10,000-square-foot minimum lots as hurdles before it can move ahead.
Ocean Boulevard building permit reviews
Building permit applications at 5400 North Ocean Boulevard and a revised plan at 5206 North Ocean Boulevard were on the agenda, touching the beachfront commercial corridor.
BJ's Wholesale Club revised site plan
A revised plan for the big-box store between Champions Boulevard and Highway 90 still needs landscape and lighting plans, tree removal justification, fire access fixes, and Planning Commission review. It's a major commercial project that will shape traffic and shopping in that corridor.
House of Blues site plan review
The House of Blues project needs to remove a protected 46-inch live oak, and zoning staff flagged that a minor amendment to the planned development district is required first. Protected tree rules keep mature canopy in town.
Large single-family home on Holly Drive
A site plan for a single-family home with eight sleeping areas at 2503 Holly Drive was on the agenda — a size that often raises questions about parking and neighborhood character.
Hope Pointe PDD: townhomes replaced with cottage-style homes
Three Hope Pointe items came before the committee — a ship store permit, revised subdivision drawings along Sanctuary Way, and associated site plan needs — showing the master-planned community is still moving forward.
Compass Resort site plan revisions
All four Compass Resort variance requests — covering tree removal, compact parking, and landscaping reductions — were pushed to May at the developer's request. Residents watching the resort's parking and buffering plans will have to wait another month.
North Beach Plantation Phase III tower swap
A plan to replace the approved 120-unit Phase III tower with 14 single-family homes was postponed at staff's request while technical review issues are worked out.
Amazon Prime Air drone facility at Palmetto Coast Industrial Park
Multiple residents urged the Council to slow down or reject an Amazon drone launch pad proposed near Highway 31, citing driver distraction, conflicting information from Amazon representatives, and the risk that other retailers would follow. Councilwoman Wober said she has contacted state legislators, and the Planning Commission was set to hear the matter the next evening.
Nine-bedroom oceanfront single-family home
A large seven-sleeping-area beach house is proposed on Ocean Boulevard, drawing staff scrutiny over parking, traffic backing onto the boulevard, water service, and stormwater detention.
Proposed auto body shop at 1014 Sea Mountain Highway
A developer wants to convert an existing building into an auto body shop. Fire staff say sprinklers, alarms and paint booth compliance will likely be required, so the plan still has hurdles to clear.
North Myrtle Beach Dealership at 3484 Sandler Boulevard
A car dealership is planned on Sandler Boulevard, drawing the heaviest review of the day — especially on fire protection and safe pedestrian access to the building.
7-Eleven at 70 Highway 17 South
A new gas station is proposed at 870 Highway 17 South near 9th Avenue South. Reviewers want traffic studies, possible signalization, and road improvements before it moves forward.
Dockside Preserve Phase 1A final plat
A zoning variance lets Dockside Preserve Phase 1A remove certain trees only if nine specified trees are protected and 493 inches of same-species replacements are planted — though two of the protected trees turned out to be dead. The final plat also has drawing errors and unresolved fire-access comments to fix.
Three small annexations for city water
Three small parcels on Waterway Drive and Jacks Circle joined the city so their owners can get city water. The properties become subject to city taxes and services.
Cherry Grove 25-lot subdivision
An 8.31-acre property off Ye Olde Kings Highway would be recombined into 25 single-family lots with new streets. Sketch plan approved; engineering and tree questions get sorted at preliminary plat.
Single access route for Barefoot Lakes homes
The new 46-home Barefoot Lakes subdivision would have only one way in and out. To make that acceptable, the city is requiring every home to have internal fire sprinklers, and it can withhold building permits for homes without them.
New home construction in Barefoot Lakes and Marshfield
Two applications together cover 113 new residential lots — 46 in Barefoot Lakes and 67 in Marshfield Phase 3B — adding to growth pressure along Marsh Glen Drive and the Marshfield community.
39-home subdivision on Cane Street / Waterway Drive
A 39-home in-common project with open space off Cane Street is moving forward, with its Planning Commission date set for September 22.
Small pocket annexations from Horry County
Three small parcels — one on Waterway Drive and two on Jacks Circle — are being annexed into the city. Owners get access to city water, sewer, police, and fire services; the properties become subject to city taxes.
Towers on the Grove oceanfront paid parking lot
An undeveloped oceanfront parcel in the Towers on the Grove PDD would become a 37-stall paid gravel parking lot until September 2028. The redesign addresses neighbor concerns about portable toilets, screening, and beach access, but it shifts parking pressure onto a busy stretch of the shoreline.
Long Bay Marina five-lot subdivision
A plan to create five residential lots off West Pelican Road is moving through review, with erosion control fixes needed near the waterway.
Drift Eatery restaurant development
A new restaurant on Highway 17 South is in review, needing SCDOT permits, stormwater compliance, and extensive fire code work for its fire line.
Pre-annexation east of Harrelson Avenue
Two parcels east of Harrelson Avenue are seeking to come into city limits. Water and sewer are available, but the developer would pay to extend them, and the city needs proof of who can legally act for the LLC.
Cornhole Mini Golf course on Sea Mountain Highway
An owner wants to build an 18-hole Cornhole Mini Golf course with an ice cream shop and concessions near the beach. It needs a major Planned Development amendment, Planning Commission sign-off, and two City Council readings before it can happen.
Conveyance of Long Bay Road parcel to North Strand Helping Hand
The city will deed 1.7 acres to the nonprofit, which has leased the site for about $60 a year and needs to make capital improvements. If the group ever stops using it as a nonprofit, the land reverts to the city.
Parkway Group PDD amendment for McDowell Corporate Center
A major planned development amendment would allow four buildings in the McDowell Corporate Center. It heads to the Planning Commission September 22 and City Council for two readings in October.
Construction supply facility near Lewis Ocean Bay Preserve
A warehouse and outdoor storage yard is proposed at 8550 Water Tower Road, next to a sensitive nature preserve. Staff want native, Firewise landscaping and a major amendment to the development agreement.
New Smithfield Chicken 'N Bar-B-Q restaurant
A new BBQ restaurant is planned at 50 Lassiter Court. Staff want a lighting plan and a safe, accessible walkway from the public sidewalk before the plan is finalized.
Indigo Townhomes at the Preserve plat and wetland buffers
Nineteen townhome lots were approved on 4.85 acres, but two lots back up to wetlands with almost no buffer — staff said a 2011-era development agreement froze rules before the buffer ordinance existed.
Waterway Drive and Jacks Circle Road annexations
Two small parcels — 0.22 acres at 1323 Waterway Drive and 0.5 acres at 1424 Jacks Circle Road — could join the city. Water and sewer availability differ between the sites, and both are slated for the August 18 Planning Commission hearing.
Waterside Wax Myrtle private bridge safety certification
The Waterside Wax Myrtle development needs a private bridge built, and the city wants proof it's engineered to state standards before it opens. A signed, sealed certification package with third-party inspections — plus a maintenance agreement — is required.
Waterfront Park at Grande Dunes North Village Boulevard
A minor amendment to the Parkway Group PDD sets out a detailed plan for a small waterfront park with a pavilion, trails, and four parallel parking spaces. Commissioners debated whether the parking is enough, but residents and the HOA can restripe it later for golf carts if needed.
Highway 17 corridor restaurant renovation
The former Sea Merchants Restaurant building predates zoning and was squeezed by road widening. A 14-inch overhang variance supports the renovation, window protection and pedestrian shelter.
17-lot subdivision near 16th–18th Avenue North
A 5.24-acre vacant tract will become 17 single-family lots along Hillside Drive, Springland Lane, and 16th through 18th Avenue North, with new sidewalks and street trees on existing public rights-of-way.
Waterside at Sycamore Phase 3A
A final plat locking in 163 residential lots, common areas, and rights-of-way in Phase 3A of the Waterside at Sycamore development. It cleared on a unanimous vote with no public comment.
Chick-fil-A replacing TGI Friday's at Gator Hole
Chick-fil-A wants to move from its cramped site across Ashley Loop to the old TGI Friday's spot, doubling its size. Council's worry is traffic backing up on Highway 17 and Ashley Loop — the developer proposes a dedicated left-turn lane and signage, while some Council members favor a roundabout. The landlord has yet to weigh in on any traffic improvements.