Civic Issues
Topics getting the most attention in Lexington public meetings, ranked by how frequently they are discussed.
4 issues in water utilities with high priority
Massive sewer and water capital investment program
The town is moving forward with a sewer hydraulic model to plan future wastewater capacity — informational only at this meeting.
Cross-connection control program protections
Final approval of ordinance updates that keep town code in step with the new water protection program, guarding drinking water from backflow contamination.
FY 2027 Enterprise Fund Budget and future utility rates
Operating costs are rising about 9% a year while revenues grow less than 3%, so the Town is budgeting for a rate study — its first in about six years — that will likely recommend rate increases. No increase is planned for the current year.
14 Mile Creek Gravity Trunk Sewer Project
The town's sewer system is getting major attention: upgrades to the Mill Stream Station that handles 90–95% of sewer flow, hydraulic modeling, and system-wide inspections. Long-term, the town must expand sewer treatment capacity in Cayce, and a Professional Engineering Report will define scope and costs.